Uncertainty explorer: what if families respond differently?

Not affiliated with Portland Public Schools. Right Size Portland is an independent project; it is not endorsed by or speaking for PPS. Every figure here is this site's calculation.

PPS's scenario models assume that no family leaves PPS because of a closure or program move and that 80% of immersion students follow a moved program. This page draws futures in which those assumptions vary within the range PPS's own past changes showed, together with the uncertainty in how many kindergartners enroll and how classes progress, and carries each through the explorer's staffing formula, its General Fund estimate and whether each school's students fit in its classrooms.

The main explorer, with every scenario and the methods behind its figures: Right Size Portland. Past changes and lost students: School changes and lost students. Every school each scenario changes: Schools each scenario changes.

Changelog
November 20, 2026
  • How many students leaving would erase the savings: a table of the crossover for each scenario and year, the students who would have to leave PPS before the savings less the revenue lost reach zero.
  • Grade and boundary change attrition is now leaving the district, from −2% to 4% (most likely 1%), from −15% to 15%; the kindergarten dip is now kindergartners not enrolling in PPS, from 0% to 10% (most likely 2%, a judgment), from 0% to 30% (most likely 15%). Both earlier ranges measured loss from a group of schools, counting families who chose other PPS schools.
  • The draws load from their own file after the page's text, so the page opens sooner.
  • Students who leave PPS also shown as a share of the students the changes move (every student at a closing school in the year it closes, and PPS's count of students each changing school's rules move), on the summary card and in the year-by-year table.
  • Links keep the parameter ranges: the address follows every range, scenario and year chosen, and “Copy link to these choices” copies it.
  • Closure and program move attrition widened to 0%–10% (most likely still 1%), and 7,500 draws, so a 4%–6% window for both still keeps several hundred draws.
  • Closure and program move attrition widened to 0%–6% (most likely still 1%), and 5,000 draws instead of 1,000, so a narrow window such as 3%–5% for both still keeps a few hundred draws.
  • Room fit now assumes each scenario can be made to fit at its own projection: it counts only the classrooms the draws need beyond the projection's (or beyond PPS's classrooms where those are more), with the extra rooms at the 95th percentile.
  • Closure attrition is now leaving the district, from 0% to 4% (most likely 1%), as program move attrition, which was 0% to 8% (most likely 2%). Closure attrition was 5% to 41% (most likely 23%): the change attrition page's measure of past closures, which counts every student no longer at the closing and receiving schools, including those who moved to other PPS schools. The SEGC equity audit found about 1 point more students leaving PPS at the schools the 2023 changes touched than elsewhere. Students who leave the receiving schools but stay in PPS are not modeled.
  • Histogram markers show their values (the median and PPS's assumptions).
  • A summary card for the memo's cost method: the scenario's closures all costed on 2027-28 numbers, as the Superintendent's memo costs them, with the same closures each in the year it closes.
  • After the closures' other costs: the savings less the transportation, operations, facility upgrades, moving and contingency the Superintendent's memo lists, beside the memo's own figures and the memo's figures with each closure moved to the year it closes (Final Recommendation). A note at the bottom repeats the memo's table school by school, with this page's figures on 2027-28 numbers and in the year each school closes, and each school's receiving schools.
  • Closures only, 2027-28 basis, added beside the savings at PPS's assumptions: the scenario's closures alone, all costed on 2027-28 numbers, as the Superintendent's memo costs them (Final Recommendation: $9.5 million, against the memo's $10.2 million with Odyssey's building move).
  • Net savings at PPS's assumptions added to the net card, its chart marker and the year-by-year table. PPS's models assume no student leaves, so it equals the savings at PPS's assumptions.
  • Program following rate widened to 40%–100% (most likely still 88%), from 70%–97%, so much lower following, or every student following, can be tested with its range sliders.
  • Page created: Monte Carlo draws of kindergarten capture, grade progression, school-level forecast error, attrition after closures, grade and boundary changes and program moves, the kindergarten dip in closed schools' areas and the program following rate, for the Final Recommendation, Scenarios A and B and draft Scenario D; formula staffing and General Fund savings against Status Quo, the state revenue students who leave take with them, schools below the size threshold, room fit by school, and the share of each result's variation each parameter explains. Narrow any parameter's range to see the draws inside it.

Parameters

Each draw takes every parameter from the distribution shown (grey: all draws; dark: the draws inside the ranges chosen). Narrow a range with its sliders to see the futures where that assumption holds; the results below use only the draws inside every range. Dashed line: PPS's assumption.

Loading the draws…

Results

Scenario
Year

Year by year

Medians of the draws inside the ranges, with 5th to 95th percentiles; the same draws in every year.

After the closures' other costs

How many students leaving would erase the savings

What drives the range

The share of each result's variation across the draws inside the ranges that each parameter explains (squared standardized regression coefficients); the rest is school-level forecast error, year-to-year noise and how the parameters combine. Narrowing a parameter's range shrinks its share.

Rooms beyond the projection

Method and sources

Note: the Superintendent's memo's table, each closure in the year it closes